Installing

spanner3
THERMODUL system information in two separate phases:
  • 1st fix – bringing the supply and return piping into the
    various rooms
  • 2nd fix – Installation phase of the THERMODUL system
    for finished internal work

1st fix

Preliminary layout, to execute the rough-in phase consists of: bringing the supply and return piping into the various rooms, which should leave the wall at a height h 3.5 – 7 cm from the floor and already be bent parallel to the wall itself to permit the subsequent coupling to the THERMODUL heating cores.
Plan for possible passage beneath the door sill with multilayer piping, pre-insulated copper piping, etc.

planning thermodul

2nd fix

Install the internal corners, external corners and end cap sections. Support the rod on the wall, mark, drill and fasten
the rod and insert the upper nib of the cover into the appropriate seat. It is recommended mounting a rod every 50-60 cm.

planning thermodul

The heating cores are cut and inserted into position with the length indicated in the design and are connected to pipes in brazed copper or with press-fit connections in copper. At the corners, some 15-20 cm of bare copper tube without fins must be allowed.

planning thermodul

After the sealing test, cut and measure the front radiator panel; it is hooked to the upper part of the rod and is fastened to the lower part by quick hook and screws.

planning thermodul

See also FAQ and Download pages.